Skip to content
ADU Builder Winnipeg
ADU under construction, a dark upper module set on a new concrete base

ADU Plans & Permits in Winnipeg

Permit drawings, the site plan, the servicing plan and every application the City wants, plus a hearing if your lot needs one. You make the decisions, we do the running around.

At a glance

Development permit
Required
Building permit
Required
Plumbing & electrical
Separate permits
Servicing plan
Detached suites
Hearing
Only if needed

What the City needs

Every Permit an ADU Needs in Winnipeg

In the order they usually happen. We prepare and submit all of them.

ApprovalWhat it coversNeeded for
Variance or conditional useA public hearing for a suite that doesn't meet the zoning by-law as writtenOnly some lots
Development permitZoning: use, size, height, setbacks, parking, coverage. Site plan, elevations, floor plans and landscaping are reviewedEvery suite
Site servicing planHow water and sewer reach the suite, prepared by a Manitoba land surveyor or civil engineerDetached suites
Building permitThe construction drawings against the Manitoba Building CodeEvery suite
Plumbing permitThe water, sewer and fixturesEvery suite
Electrical permitThe panel, wiring and the feed from the house or streetEvery suite
InspectionsFootings, framing, insulation, plumbing, electrical and finalEvery suite
From the City of Winnipeg's secondary suite requirements. Applications go through Permits Online or the Zoning & Permits office.

Hearings

If Your Lot Needs a Hearing

A suite that meets the zoning by-law goes straight to permits. One that doesn't, say the lot is a bit small, the suite is a bit tall or it sits a bit close to a property line, needs a variance or a conditional use approval, and that means a public hearing.

A hearing isn't a disaster, but it is a risk. The drawings have to be far enough along to show what you're building, neighbours get a say, and if it's refused the design money is spent. Winnipeggers who've been through it say that's the part that hurt most.

Here's how we keep that risk small:

  • We check at the start whether a hearing is likely, before full drawings are paid for.
  • Where a small change avoids the hearing, we'll usually suggest it.
  • If a hearing makes sense, every variance goes into one application and one hearing.
  • We encourage a friendly word with the neighbours before the notice arrives in their mailbox.
Tall gabled two-storey backyard home in dark blue siding with big windows and a patio

The drawing set

What Goes Into a Permit Set

The City asks for most of these with the development permit, and won't issue it until they're approved.

  • Site plan with setbacks and parking
  • Floor plans
  • Elevations, materials and windows
  • Site servicing plan
  • Sections and structural details
  • Lighting and outdoor spaces
  • Fencing and landscaping
  • Energy code compliance

Not sure your lot qualifies? Start with the Winnipeg ADU rules, or let us check it for you.

FAQ

Permit Questions

Short answers. If yours isn't here, call and ask. It costs nothing.

  • What permits do I need for an ADU in Winnipeg?

    A development permit and a building permit for the suite, plus separate electrical and plumbing permits. A detached suite also needs a site servicing plan for the water and sewer. If the suite doesn't meet the zoning by-law as written, it needs a variance or conditional use approval as well.

  • How long do ADU permits take in Winnipeg?

    It varies with the City's workload and the time of year. As a planning number, allow two to four months for permits on a suite that meets the by-law, and longer if it needs a hearing. The City publishes its current processing times online.

  • What is a conditional use hearing?

    A public hearing for a suite that doesn't fit the zoning rules as written. Neighbours are notified and can speak. It adds time and some risk, which is why we check for it before full drawings are paid for, and design to avoid it where we can.

  • Can I get the development and building permits at the same time?

    Yes. The City allows the building permit application once the development permit application is complete, so both can be reviewed together. Or you can wait for the development permit first. Doing them together usually saves time.

  • What happens if I build a suite without a permit?

    It isn't a legal suite, so it can't be rented legally, insurance may not cover it, and it can come up when you sell. The City can order work stopped or removed. Legalizing it later usually costs more than permitting it the first time.

Free site check

Find out what your lot can hold

Tell us where you are and what you have in mind. We'll look at your lot, the lane, the sewer line and the by-law, and tell you straight what's possible and roughly what it costs.

Rather talk it through? Call or text(431) 444-6291

Request a free quote

We reply within one business day.

Call nowFree quote